Work Breakdown Structures Assignment

Work Breakdown Structures Assignment
Work Breakdown Structures Assignment
Question Description
To prepare:
Review this week’s Learning Resources on work breakdown structures.
Thoroughly examine the Team Project Overview document in this week’s Learning Resources to familiarize yourself with the requirements of this Assignment.
Engage in discussion with your team members on how you will collaborate, distribute work, and submit the Assignment.
THEN
To complete Part 2 of your Team Project:
Collaborate on a 2- to 3-page paper that summarizes the group’s work and includes a WBS diagram of at least five high-level deliverables and a list of relevant tasks and subtasks. Follow the guidelines provided in the Team Project Overview document found in this week’s Learning Resources.
1.1 – Project Team Formation-Nedra
1.2- Hardware/Software Acquisition-Janet
1.3 -Training-Lakeisha
1.4- Test plan-
1.5- Implementation-
Just do the 1.4 TEST PLAN ONLY
Please attachments for reference. If you need some info or you need to log in to my account. Just tell me. I’ll give you a tip after you finish. Thanks.
You must proofread your paper. But do not strictly rely on your computer’s spell-checker and grammar-checker; failure to do so indicates a lack of effort on your part and you can expect your grade to suffer accordingly. Papers with numerous misspelled words and grammatical mistakes will be penalized. Read over your paper – in silence and then aloud – before handing it in and make corrections as necessary. Often it is advantageous to have a friend proofread your paper for obvious errors. Handwritten corrections are preferable to uncorrected mistakes.
Use a standard 10 to 12 point (10 to 12 characters per inch) typeface. Smaller or compressed type and papers with small margins or single-spacing are hard to read. It is better to let your essay run over the recommended number of pages than to try to compress it into fewer pages.
Likewise, large type, large margins, large indentations, triple-spacing, increased leading (space between lines), increased kerning (space between letters), and any other such attempts at “padding” to increase the length of a paper are unacceptable, wasteful of trees, and will not fool your professor.
The paper must be neatly formatted, double-spaced with a one-inch margin on the top, bottom, and sides of each page. When submitting hard copy, be sure to use white paper and print out using dark ink. If it is hard to read your essay, it will also be hard to follow your argument.
ADDITIONAL INSTRUCTIONS FOR THE CLASS
Discussion Questions (DQ)
Initial responses to the DQ should address all components of the questions asked, include a minimum of one scholarly source, and be at least 250 words.
Successful responses are substantive (i.e., add something new to the discussion, engage others in the discussion, well-developed idea) and include at least one scholarly source.
One or two sentence responses, simple statements of agreement or “good post,” and responses that are off-topic will not count as substantive. Substantive responses should be at least 150 words.
I encourage you to incorporate the readings from the week (as applicable) into your responses.
Weekly Participation
Your initial responses to the mandatory DQ do not count toward participation and are graded separately.
In addition to the DQ responses, you must post at least one reply to peers (or me) on three separate days, for a total of three replies.
Participation posts do not require a scholarly source/citation (unless you cite someone else’s work).
Part of your weekly participation includes viewing the weekly announcement and attesting to watching it in the comments. These announcements are made to ensure you understand everything that is due during the week.
APA Format and Writing Quality
Familiarize yourself with APA format and practice using it correctly. It is used for most writing assignments for your degree. Visit the Writing Center in the Student Success Center, under the Resources tab in LoudCloud for APA paper templates, citation examples, tips, etc. Points will be deducted for poor use of APA format or absence of APA format (if required).
Cite all sources of information! When in doubt, cite the source. Paraphrasing also requires a citation.
I highly recommend using the APA Publication Manual, 6th edition.
Use of Direct Quotes
I discourage overutilization of direct quotes in DQs and assignments at the Masters’ level and deduct points accordingly.
As Masters’ level students, it is important that you be able to critically analyze and interpret information from journal articles and other resources. Simply restating someone else’s words does not demonstrate an understanding of the content or critical analysis of the content.
It is best to paraphrase content and cite your source.
LopesWrite Policy
For assignments that need to be submitted to LopesWrite, please be sure you have received your report and Similarity Index (SI) percentage BEFORE you do a “final submit” to me.
Once you have received your report, please review it. This report will show you grammatical, punctuation, and spelling errors that can easily be fixed. Take the extra few minutes to review instead of getting counted off for these mistakes.
Review your similarities. Did you forget to cite something? Did you not paraphrase well enough? Is your paper made up of someone else’s thoughts more than your own?
Visit the Writing Center in the Student Success Center, under the Resources tab in LoudCloud for tips on improving your paper and SI score.
Late Policy
The university’s policy on late assignments is 10% penalty PER DAY LATE. This also applies to late DQ replies.
Please communicate with me if you anticipate having to submit an assignment late. I am happy to be flexible, with advance notice. We may be able to work out an extension based on extenuating circumstances.
If you do not communicate with me before submitting an assignment late, the GCU late policy will be in effect.
I do not accept assignments that are two or more weeks late unless we have worked out an extension.
As per policy, no assignments are accepted after the last day of class. Any assignment submitted after midnight on the last day of class will not be accepted for grading.
Communication
Communication is so very important. There are multiple ways to communicate with me:
Questions to Instructor Forum: This is a great place to ask course content or assignment questions. If you have a question, there is a good chance one of your peers does as well. This is a public forum for the class.
Individual Forum: This is a private forum to ask me questions or send me messages. This will be checked at least once every 24 hours.

Struggling to find relevant content or pressed for time? – Don’t worry, we have a team of professionals to help you on
Work Breakdown Structures Assignment
Get a 15% Discount on this Paper
Order Now
Calculate the price
Make an order in advance and get the best price
Pages (550 words)
$0.00
*Price with a welcome 15% discount applied.
Pro tip: If you want to save more money and pay the lowest price, you need to set a more extended deadline.
We know how difficult it is to be a student these days. That's why our prices are one of the most affordable on the market, and there are no hidden fees.

Instead, we offer bonuses, discounts, and free services to make your experience outstanding.
Sign up, place your order, and leave the rest to our professional paper writers in less than 2 minutes.
step 1
Upload assignment instructions
Fill out the order form and provide paper details. You can even attach screenshots or add additional instructions later. If something is not clear or missing, the writer will contact you for clarification.
s
Get personalized services with MyCoursebay
One writer for all your papers
You can select one writer for all your papers. This option enhances the consistency in the quality of your assignments. Select your preferred writer from the list of writers who have handledf your previous assignments
Same paper from different writers
Are you ordering the same assignment for a friend? You can get the same paper from different writers. The goal is to produce 100% unique and original papers
Copy of sources used
Our homework writers will provide you with copies of sources used on your request. Just add the option when plaing your order
What our partners say about us
We appreciate every review and are always looking for ways to grow. See what other students think about our do my paper service.
Human Resources Management (HRM)
Thanks for your assistance.
Customer 452701, November 9th, 2022
Nursing
Great work. thank you again!
Customer 452707, August 7th, 2022
Nursing
Excellent work! Thanks again!
Customer 452707, December 11th, 2022
Management
Great job
Customer 452643, October 31st, 2021
Human Resources Management (HRM)
Thank you very much.
Customer 452701, September 10th, 2023
History
Thanks for your help and support as always!
Customer 452909, May 18th, 2024
IT, Web
Paper was great and accomplished everything I needed.
Customer 452885, October 27th, 2022
Nursing
Everything was done perfectly. Thank you.
Customer 452707, June 15th, 2022
Other
AWESOME
Customer 452813, June 19th, 2022
IT, Web
Excellent job on the paper.
Customer 452885, January 25th, 2023
Social Work and Human Services
Thank You, Don!!! :)
Customer 452587, November 9th, 2021
Social Sciences
great
Customer 452813, January 7th, 2024
OUR GIFT TO YOU
15% OFF your first order
Use a coupon FIRST15 and enjoy expert help with any task at the most affordable price.
Claim my 15% OFF Order in Chat

Good News ! We now help with PROCTORED EXAM. Chat with a support agent for more information

NEW

Thank you for choosing MyCoursebay. Your presence is a motivation to us. All papers are written from scratch. Plagiarism is not tolerated. Order now for a 15% discount

Order Now